ANAHTAR TESLİM-SABİT FİYAT SÖZLEŞME USULÜNCE ALINAN BİR PROJENİN RİSK DEĞERLENDİRİLMESİNİN YAPILMASI İÇİN METOT ÖNERİSİ VE ÖRNEK UYGULAMA

dc.contributor.advisor Dr. Murat Kuruoğlu tr_TR
dc.contributor.author Burcu AKYILDIZ tr_TR
dc.contributor.department Yapı İşletmesi tr_TR
dc.contributor.department Construction Management en_US
dc.date 2010 tr_TR
dc.date.accessioned 06.07.2010 tr_TR
dc.date.accessioned 2015-07-10T11:33:18Z
dc.date.available 2015-07-10T11:33:18Z
dc.date.issued 07.07.2010 tr_TR
dc.description Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2010 tr_TR
dc.description Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2010 en_US
dc.description.abstract Ekonominin en önemli iş kollarından biri de ulusal gelire katkısı ve istihdam yaratma becerisi ile inşaat sektörüdür. İnşaat sektörü diğer sektörlere oranla tipik özellikleri nedeniyle daha fazla belirsizlik içermektedir. Ancak bu kadar belirsizliğin dolayısı ile riskin olduğu bir sektörde ilginçtir ki risklere gereken ilgi gösterilmemekte hatta çoğu firmanın projenin risk analizi yapmadan işi aldıkları görülmektedir. _x000D_ İnşaat projesinin süresinin ve maliyetinin belirlenmesi kararlarında, inşaat sektörünün özellikleri ve içerdiği tipik riskler sebebiyle sıklıkla yanılgılar meydana gelmektedir. Özellikle anahtar teslim-sabit fiyat sözleşme usulünün uygulandığı ihalelerde teklif edilen fiyat, değiştirilemediği için maliyeti etkileyen riskler yükleniciyi ciddi anlamda zorlamaktadır. Aynı zamanda bu şekilde ihale edilen işlerde genellikle planlanan programdan sapmalar durumunda yüklenici ciddi meblağlarda ceza ödemek zorunda kalmaktadır._x000D_ Bu çalışmanın amacı, anahtar teslim-sabit fiyat usulünce ihale edilen tipik bir projenin maliyet ve süre olarak risk analizinin yapılmasıdır. Örnek olay incelemesi kısmından önce aralarındaki farkları anlayabilmek amacıyla sözleşme tipleri anlatılmış, risk kavramı, yönetimi ve analiz yöntemleri ele alınmış ve risk analizinin yapılmasında en çok kullanılan yazılımlar anlatılmıştır. Örnek olay incelemesi olarak ise gerçekleşen ve simülasyon sonucu bulunan değerlerin kıyaslanabilmesi için daha önceden yapımı tamamlanmış bir projenin ele alınması tercih edilmiştir. Risk analizine ilişkin simülasyonların sayısını artırabilmek için de elle simülasyon yerine @Risk yazılımı kullanılarak simülasyon yapılması tercih edilmiştir. tr_TR
dc.description.abstract By the contribution to national income and the generating employment capability, construction sector can be named as one of the most important branches of the economy. Construction sector includes more uncertainty than other sectors because of its typical features. However, although so much uncertainty -so risks- take place in this sector, it is suprising that the needed attention does not taken on interest, moreover most of the companies win the tender without calculating the project’s risk. _x000D_ Because of the features of constuction sector and its typical risks, there are too often mistaking decisions in determining the duration and the cost of the projects. Especially, being unable to change the bidding price in bids based on turnkey-fixed price contract method makes contractors have serious difficulties because of cost affective risks. At the same time, usually contractors are forced to pay serious penalties when a deviation occurs in planned program in this type of bidding method. _x000D_ The purpose of this study, analyzing the duruation and cost risks in a typical project based turnkey-fixed price contract method. Before case study section; first the contract types are explained in order to understand the difference between the types, moreover the risk concept, its management and analysis methods are considered and finally the most commonly used risk analysis softwares are described. In case study section, to compare simulation results and realised results a completed project has been chosen. @Risk simulation software has been preffered rather than by hand simulation for risk analysing in order to increase the number of simulations. en_US
dc.description.degree Yüksek Lisans tr_TR
dc.description.degree M.Sc. en_US
dc.identifier.uri http://hdl.handle.net/11527/7276
dc.publisher Fen Bilimleri Enstitüsü tr_TR
dc.publisher Institute of Science and Technology en_US
dc.rights İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak herhangi bir biçimde yeniden oluşturulması veya dağıtılması yazılı izin alınmadan yasaklanmıştır. tr_TR
dc.rights İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. en_US
dc.subject Risk, risk analizi, anahtar teslim götürü bedel, yöneylen araştırması, @Risk, optimizasyon, süre optimizasyonu, maliyet optimizasyonu, olasılık tr_TR
dc.subject Risk, risk analysis, risk management, lump-sum bidding, operations research, @Risk, optimization, time optimization, cost optimization, probablity. en_US
dc.title ANAHTAR TESLİM-SABİT FİYAT SÖZLEŞME USULÜNCE ALINAN BİR PROJENİN RİSK DEĞERLENDİRİLMESİNİN YAPILMASI İÇİN METOT ÖNERİSİ VE ÖRNEK UYGULAMA tr_TR
dc.title.alternative METOT STUDY FOR RISK EVALUATION OF PROJECTS BASED ON TURN KEY-FIXED PRICE CONTRACT SYSTEM AND A CASE STUDY en_US
dc.type Thesis en_US
dc.type Tez tr_TR
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
10750.pdf
Boyut:
5.51 MB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
3.14 KB
Format:
Plain Text
Açıklama