Rize – Pazar Tüneli Güzergahının Mühendislik Jeolojisi Etüdü

dc.contributor.advisor Vardar, Mahir tr_TR
dc.contributor.author Canpolat, Murat tr_TR
dc.contributor.department Mühendislik Jeolojisi tr_TR
dc.contributor.department Engineering Geology en_US
dc.date 2003 tr_TR
dc.date.accessioned 2015-11-06T12:20:45Z
dc.date.available 2015-11-06T12:20:45Z
dc.description Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2003 tr_TR
dc.description Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2003 en_US
dc.description.abstract Tez konusu; Karadeniz Devlet Sahil yolunun Çayeli–Hopa kesiminde, Pazar geçişinde, km: 163+200 – 163+400 arasında inşa edilecek Pazar Tünelinin mühendislik jeolojisi bakımından değerlendirmesi ve en uygun tünel açım tekniğinin belirlenmesidir. Proje; en uygun mühendislik çözümlerini getirmeli, mimarlık ve topografik açıdan yörenin çevresel özellikleri ve tarihi dokusu ile uyuşmalıdır. Rize Pazar Tüneli çiftli tüplü tünel olarak inşa edilecektir. Tüplerden deniz tarafında kalan sol tüp 98 m uzunluğunda, sağ tüp ise 144 metre uzunluğunda olacaktır. Arazi çalışmaları yapılmış, geniş bir literatür araştırması yapıldıktan sonra, 3 adet mekanik sondaj açılmış, jeofizik özdirenç ve sismik ölçümlerle bu çalışmalar desteklenmiştir. TS 699’a göre hazırlanan sondaj karot örnekleri ve yüzeyden alınan kayaç örnekleri üzerinde ITU MJKM laboratuarında kayaçların fiziksel ve mekanik özelliklerinin saptanması için deneyler yapılmıştır. Ayrıca kayaç örneklerinden hazırlanan ince kesitlerin mineralojik – petrografik özellikleri tayin edilmiştir. Tüm bu veri ve bilgiler ışığında tünel güzergahının 1/200 ölçekli mühendislik jeolojisinin haritası ve kesitleri hazırlanarak, üç boyutlu blok ve kontur diyagramları ile yerin jeolojik yapısı yansıtılmıştır. Sonuç olarak da incelenen güzergah çok kısa olmasına rağmen, tünelli geçiş seçeneği için çok yönlü sorunlarla başedilmesini gerektiren özellikler taşıdığı, bu topografik, çevresel ve geoteknik sorunlardan kurtulabilmek için aç–kapa metodunun en uygun metot olduğuna karar verilmiştir. Ancak istimlak sorunları ve süre kaybı aynen durmaktadır. tr_TR
dc.description.abstract The main topic of this thesis contains; Pazar Tunnel that will be constructed Black Sea State Coastal Express Road between km: 163+200 – 163+400 in the Çayeli–Hopa section on the Pazar passage, from the point of view engineering geology, its interpretation and to be defined the most appropriate open technique for tunnel. This project has to provide the most appropriate engineering solutions aspect of architecture and topography, must be compatible environmental and historical properties. Rize Pazar Tunnel is going to be constructed as a double tube tunnel. The left tube that is on the coast side will be 98 m length and the right one will be 144 m length. Geological land search has been also done. After previous studies carried out three drilling wells has been investigated and these studies have been supported by seismic and geophysics resistivity measurements. Samples which were collected from different locations throughout the study area and the drilling recoveries prepared according to TS 699. Experiments have been carried out on the rock sample in order to define physical and mechanical features in the laboratory of ITU MJKM. Besides, mineralogical and petrographical properties are found from thin crosscuts from rock samples. By the help of all these information 1/200 scaled engineered geological maps of tunnel route and cross–sections are prepared and with the three dimensional block and contour diagrams the geological structure of the ground are reflected. This study comes up with the following results and proposals; even though the searched tunnel route is so short, the cut and cover method is thought to be more suitable in case a wide range of topographical environmental and geotechnical problems related to tunnel passage exist. Somehow, expropriation problems and time loss problem still exist. en_US
dc.description.degree Yüksek Lisans tr_TR
dc.description.degree M.Sc. en_US
dc.identifier.uri http://hdl.handle.net/11527/10070
dc.publisher Fen Bilimleri Enstitüsü tr_TR
dc.publisher Institute of Science and Technology en_US
dc.rights İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. tr_TR
dc.rights İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. en_US
dc.subject Tünel tr_TR
dc.subject Fiziksel ve Mekanik Özellikler tr_TR
dc.subject Mühendislik Jeolojisi tr_TR
dc.subject Jeomekanik tr_TR
dc.subject Aç–kapa Metodu tr_TR
dc.subject Tunnel en_US
dc.subject Physical and Mechanical Features en_US
dc.subject Engineering Geology en_US
dc.subject Geomechanic en_US
dc.subject Cut and Cover Method en_US
dc.title Rize – Pazar Tüneli Güzergahının Mühendislik Jeolojisi Etüdü tr_TR
dc.title.alternative Engineering Geological Research Of Rize – Pazar Tunnel Route en_US
dc.type Master Thesis en_US
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
1536.pdf
Boyut:
5.84 MB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
3.16 KB
Format:
Plain Text
Açıklama