Türk Yüklenicilerinin Uluslararası Teklif Aşamasında Kullanabileceği Bir Süre Maliyet Modeli
Türk Yüklenicilerinin Uluslararası Teklif Aşamasında Kullanabileceği Bir Süre Maliyet Modeli
dc.contributor.advisor | Müngen, Uğur | tr_TR |
dc.contributor.author | Özçekiç, Aydın Fevzi | tr_TR |
dc.contributor.department | Yapı Mühendisliği | tr_TR |
dc.contributor.department | Structural Engineering | en_US |
dc.date | 2007 | tr_TR |
dc.date.accessioned | 2015-07-03T11:33:55Z | |
dc.date.available | 2015-07-03T11:33:55Z | |
dc.description | Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2007 | tr_TR |
dc.description | Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2007 | en_US |
dc.description.abstract | Bu çalışma kapsamında, uluslararası inşaat sektöründe, Türk firmalarının, teklif sürecinde kullanabilecekleri bir model geliştirilmeye çalışılmıştır. Bu model, ihale bedeli ile proje süresi arasında, tamamlanmış projelerden elde edilen bilgilerin, regresyona dayalı analizi sonucu elde edilmiştir. Bu model, 1969’da Bromilow tarafından geliştirilen süre, maliyet model yapısının üzerine kurulmuştur. Bromilow’un geliştirdiği model, yıllarca birçok araştırmacı tarafından kullanılmış olup, genel olarak oldukça başarılı sonuçlar elde edilmiştir. Sonuç olarak, süre ile ihale bedeli arasında, Türk firmalarının, Ortadoğu ve Doğu Avrupa’da tamamladığı projeler incelenerek, sonuçlar oldukça pratik olarak ortaya koyulmuştur. Bu çalışmanın bir diğer amacı, deneyim ile çok hızlı olarak yapılabilen tahminlerin, geniş bir veri tabanına dayalı olarak modellenebilmesidir. Bu sayede, sistematik, karşılaştırılabilir, sorgulanabilir tahminler yapılabilecektir. Teklif aşamasında her bilgi kırıntısının büyük öneme sahip olduğu göz önüne alındığı geliştirilen modellerin önemi ortaya çıkmaktadır. | tr_TR |
dc.description.abstract | In the scope of this thesis, a model, which can be used by Turkish companies in the international tender process, is developed. This model is derived from analyzing of the completed project data of Turkish contractors in the international market. This developed model explains the relation between tender price and project duration. This model uses non linear regression analysis as mathematical base. This model has same structure with the time cost model developed by Bromilow in 1969. Bromilow’s model has been used by several researchers since 1969 and generally, researchers have accepted this model as a successful structure. This model can be used for comparison of different regions which Turkish contractors are effective in. In conclusion, results of this research are practical for the use of Turkish Contractors in tender process for Middle East and East Europe. | en_US |
dc.description.degree | Yüksek Lisans | tr_TR |
dc.description.degree | M.Sc. | en_US |
dc.identifier.uri | http://hdl.handle.net/11527/6836 | |
dc.publisher | Fen Bilimleri Enstitüsü | tr_TR |
dc.publisher | Institute of Science and Technology | en_US |
dc.rights | İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. | tr_TR |
dc.rights | İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | en_US |
dc.subject | Teklif Hazırlama | tr_TR |
dc.subject | Regresyon modelleri | tr_TR |
dc.subject | İnşaat Maliyetleri | tr_TR |
dc.subject | İnşaat İhaleleri | tr_TR |
dc.subject | Tender | en_US |
dc.subject | Regression models | en_US |
dc.subject | Construction Cost | en_US |
dc.subject | Construction Time | en_US |
dc.title | Türk Yüklenicilerinin Uluslararası Teklif Aşamasında Kullanabileceği Bir Süre Maliyet Modeli | tr_TR |
dc.title.alternative | Cost - Time Model Using In International Tender Process For Turkish Contractors | en_US |
dc.type | Master Thesis | en_US |