Proje Planlamasında Bulanık Hedef Programlama Yaklaşımı

dc.contributor.advisorGözlü, Sıtkı
dc.contributor.authorVatansever, Ramadan
dc.contributor.departmentİşletme Mühendisliği
dc.contributor.departmentManagement Engineering
dc.date2008
dc.date.accessioned2008-03-09
dc.date.accessioned2015-05-18T07:00:14Z
dc.date.available2015-05-18T07:00:14Z
dc.date.issued2008-11-19
dc.descriptionTez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2008
dc.descriptionThesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2008
dc.description.abstractBu çalışmada, Bulanık Hedef Programlama (BHP) yaklaşımının üretim faaliyetlerini içeren bir projedeki kullanımına ait bir uygulama yapılmıştır. Bu uygulamada, önceden belirlenen birden fazla sayıdaki hedefe ulaşmak için literatürdeki çok amaçlı karar verme modellerinden Hedef Programlama (HP) yöntemine ait model ve formülasyonlar kullanılmıştır. Pratikteki uygulamalarda projelere etki eden birçok etken olduğundan projeler belirsizlikler içerirler. Bu nedenle, bu çalışmada bu belirsizliklerle çalışmayı olanaklı kılan BHP yöntemi kullanılarak bu belirsizliklerin yok edilmesi amaçlanmıştır. Model geliştirilirken seçilen imalat sürecini modelleyebilmek için uzman kişilerin görüşüne başvurulmasının yanında teknik gezilerle süreçler doğrudan gözlemlenmiştir. Elde edilen verilerle projeye ait matematiksel model oluşturulmuştur. Model, önceden belirlenen hedefler doğrultusunda hem geleneksel yöntemler (Kritik Yol Yöntemi – CPM) hem de HP ve BHP yaklaşımları ile çözülmüştür. Sonuçlar, BHP yaklaşımının üretim alanındaki projelerde kullanılabileceğini göstermektedir. Bu alanda gelecekte yapılacak çalışma ve uygulamalar bu yaklaşımın yaygınlaşmasına katkıda bulunacak, projelerdeki belirsizlikler tahmin edilebilir olacaktır.
dc.description.abstractIn this study, Fuzzy Goal Programming (FGP) technique is applied to a Project in the area of manbufacturing. In order to reach the pre-determined goals, Goal Programming (GP) model and formulations are used. Due to the fuzzy environment of the of the practical applications, a FGP model which allows working with fuzzy goals and constraints is used to formulate a mathematical model of the problem. The model is applied to the prototype shoe production of a shoe manufacturer in Istanbul. While developing a mathematical model for the problem, technical investgations and interviews were scheduled. Using the data obtained from these investigations and interviews, the mathematical model for the problem was formulated. This model was solved by using Critical Path Method (CPM), GP, and FGP formulations. The comparison of FGP solution with other methods shows that FGP is a useful approach for planning manufacturing projects. Future works will ease FGP to become widely used method for planning manufacturing projects.
dc.description.degreeYüksek Lisans
dc.description.degreeM.Sc.
dc.identifier.urihttp://hdl.handle.net/11527/2072
dc.publisherFen Bilimleri Enstitüsü
dc.publisherInstitute of Science and Technology
dc.rightsİTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır.
dc.rightsİTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.
dc.subjectBulanık Hedef Programlama
dc.subjectProje Planlama
dc.subjectBulanık Mantık
dc.subjectBulanık Kümeler
dc.subjectHedef Programlama
dc.subjectFuzzy Goal Programming
dc.subjectProject Planning
dc.subjectFuzzy Logic
dc.subjectFuzzy Sets
dc.subjectGoal Programming
dc.titleProje Planlamasında Bulanık Hedef Programlama Yaklaşımı
dc.title.alternativeFuzzy Goal Programming Approach In Project Planning
dc.typeMaster Thesis

Dosyalar

Orijinal seri

Şimdi gösteriliyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
Ad:
8307.pdf
Boyut:
852.35 KB
Format:
Adobe Portable Document Format