Doğrusal bir inşaat projesinin dal ve sınır algoritması kullanılarak kaynak dengelemesi

dc.contributor.advisor Tatar, Gül Polat tr_TR
dc.contributor.author Örgüt, Resulali Emre tr_TR
dc.contributor.authorID 429068 tr_TR
dc.contributor.department Yapı İşletmesi tr_TR
dc.contributor.department Construction Management en_US
dc.date 2012 tr_TR
dc.date.accessioned 04.05.2012 tr_TR
dc.date.accessioned 2015-07-10T11:33:21Z
dc.date.available 2015-07-10T11:33:21Z
dc.date.issued 25.07.2013 tr_TR
dc.description Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2012 tr_TR
dc.description Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2012 en_US
dc.description.abstract Çalışmanın ana amacı, Sakarya’da inşa edilmiş 9,7 km’lik bir asfalt karayolu projesi kaynaklarının, Dal ve Sınır (D&S) algoritması kullanılarak dengelenmesidir. İncelenen karayolu projesi doğası gereği yüksek derecede doğrusal ve tekrara dayalı olduğundan, ilk inşaat planının Mahal Tabanlı Planlama (MTP) sistemi ile hazırlanmasının uygun olacağı düşünülmüştür. Bu çalışmada, proje boyunca kullanılan kamyon sayılarının dengelenmesi hedeflenmiştir. Gerçek metraj, kaynak (ör. ekipman) ve üretim oranı verileri, bu gerçek karayolu projesinden elde ediilmiştir. Bu veriler kullanılarak, ayrıca kaynak ve süre limitleri ile aktiviteler arasındaki öncül-ardıl ilişkileri de göz önünde bulundurularak, VICO Control (VC) yazılımı vasıtasıyla mahal tabanlı bir iş planı oluşturulmuştur. VC yazılımından aktivitelerin en erken başlama zamanları elde edilmiştir. Sonrasında ise en geç başlama zamanları, hem toplam hem de serbest bolluk değerlerine uygun olarak Kritik Yol Metodu (KYM)’nda uygulandığı gibi geriye doğru hesaplama yapılarak bulunmuştur. Aktivitelerin en erken ve en geç başlama zamanları ile aralarındaki öncül-ardıl ilişkilerinin belirlenmesinin ardından, kaynak dengeleme problemi, ikili tamsayı programlama modeli olarak formülize edilmiştir. Kaynak dengeleme probleminin matematiksel formülasyonunda, farklı hedef fonksiyonlar için, aktivitelerin en erken, en geç başlama zamanları ile öncül-ardıl ilişkileri de dikkate alınarak Optimizasyon Programlama Dili (Optimization Programming Language – OPL) yazılımında D&S algoritması vasıtasıyla çözülmüştür. Dengelenmiş kaynaklara ait kaynak histogramı ile en başta en erken ve en geç başlama zamanlarına göre hazırlanmış olan histogramlar ile karşılaştırılmıştır. Ayrıca, hedef fonksiyon ölçevlerinin her hedef fonksiyonda aldığı değerler de karşılaştırmalı olarak incelenmiştir. tr_TR
dc.description.abstract The main purpose of this study is to level resource utilization of a 9.7 km long asphalt highway project that was constructed in Sakarya using Branch and Bound (B&B) algorithm. Since the highway project in question was highly linear and repetitive in nature, Location-Based Planning (LBP) system was found to be appropriate for establishing the initial construction plan. In this study, the number of trucks utilized throughout the project was aimed to be leveled. Actual data of quantities, resources (i.e., equipment), and production rates were obtained from this real life highway project. Using these data, a location-based schedule was developed considering both resource and time constraints and precedence relations between activities via VICO Control (VC) software program. VC software provided earliest start dates of the activities. Latest start dates were then manually calculated by making backward pass as it is the case in Critical Path Method (CPM) in accordance with both total and free floats. Having determined earliest and latest start dates of the activities and precedence relationships between the activities, resource leveling problem was formulated as a binary integer programming model. In the mathematical formulation of the resource leveling problem, different objective functions were solved using B&B algorithm via Optimization Programing Language (OPL) software program considering the constraints of earliest and latest start dates of the activities and the precedence relationships between the activities. The leveled resource histograms was then compared with the initial resource histograms prepared based on the earliest and latest start schedules. Besides, the values of the objective function metrics for each solution were also analyzed comparatively. en_US
dc.description.degree Yüksek Lisans tr_TR
dc.description.degree M.Sc. en_US
dc.identifier.uri http://hdl.handle.net/11527/7292
dc.publisher Fen Bilimleri Enstitüsü tr_TR
dc.publisher Institute of Science and Technology en_US
dc.rights İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak herhangi bir biçimde yeniden oluşturulması veya dağıtılması yazılı izin alınmadan yasaklanmıştır. tr_TR
dc.rights İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. en_US
dc.subject Kaynak dengeleme tr_TR
dc.subject Resource leveling en_US
dc.subject Dal ve sınır algoritması tr_TR
dc.subject Mahal tabanlı planlama tr_TR
dc.subject Doğrusal inşaat projeleri tr_TR
dc.subject Branch and bound algorithm en_US
dc.subject Location-based scheduling en_US
dc.subject Linear construction projects en_US
dc.title Doğrusal bir inşaat projesinin dal ve sınır algoritması kullanılarak kaynak dengelemesi tr_TR
dc.title.alternative Resource leveling of a linear construction project using branch and bound algorithm en_US
dc.type masterThesis en_US
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
12500.pdf
Boyut:
2.43 MB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
3.14 KB
Format:
Plain Text
Açıklama