Kanban Kontrollü Mılkrun Döngülü Malzeme Besleme Sistemi: Tv Fabrikasında Bir Uygulama

dc.contributor.advisor Satoğlu, Şule Itır tr_TR
dc.contributor.author Şahin, İbrahim Ethem tr_TR
dc.contributor.department Endüstri Mühendisliği tr_TR
dc.contributor.department Industrial Engineering en_US
dc.date 2011 tr_TR
dc.date.accessioned 2011-02-03 tr_TR
dc.date.accessioned 2015-06-18T16:50:46Z
dc.date.available 2015-06-18T16:50:46Z
dc.date.issued 2011-02-16 tr_TR
dc.description Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2011 tr_TR
dc.description Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2011 en_US
dc.description.abstract Bu çalışma, TV üretimi yapılan ve yalın üretim uygulanmayan bir fabrikada, yeni kurulan iki adet son montaj hattını kapsayacak yeni bir malzeme besleme sistemi kurma çalışmalarını ve uygulama adımlarını içermektedir. Mevcut durum değer akış haritasından yola çıkılarak tespit edilen üç aşamalı iyileştirme planı ile, son montaj ile iki ana iç üretim noktası ve ambarlar arasında olmak üzere, kanban kullanımı ve hat senkronizasyonu uygulamalarının devreye alınması planlanmıştır. Uygulamada, klasik tip fiziki kartlı kanban kullanımı tercih edilmiş ve kanban hareketlerini standardize edebilmek amacıyla da milkrun (çekme esaslı, tekrarlı dağıtım) sistemi uygulanmasına karar verilmiştir. Gerekli ekipmanlar için tasarım yapılmış, yatırımları gerçekleştirilmiş, güzergahlar belirlenmiş, eğitimler verilmiş ve zaman çizelgeleri ile işleyiş standardize edilmiştir. Ayrıca kullanıcı talimatlarını içeren işleyiş prosedürü yayınlanmıştır. Tezin yapısı, literatürde yer alan ve genel prensipleri ile kabaca tarif edilen yalın üretim, kanban, milkrun konularını, yalın anlamda sıfır noktasındaki bir işletmenin takip edebileceği ve hızlıca adapte edebileceği bir uygulama kılavuzu şeklindedir. tr_TR
dc.description.abstract This thesis includes the work and the application steps held, on the material replenishment system that intended to be structured on two newly configured assembly lines at a TV production facility that had no experience with the lean manufacturing techniques. The present state value stream map has lead to a three phase development plan, that are, the establishment of a kanban system and a synchronized line application between the assembly lines and the two internal manufacturing processes (main board assembly and plastic injection) and the storage areas. At the withdrawal kanban application, classic type physical kanban cards has been preferred and in order to standardize the movement of kanbans between the assembly stations and the storage areas, a milkrun system is applied. The line side hardware and the vehicle milkrun was procured and placed. Shortly after the detailed interactive trainings were given to both blue and white collar personnel, the new material replenishment system were deployed. The thesis is structured as a simplified application guide to the general concepts of lean manufacturing, kanban and milkrun that are described at the literature, for a company that is willing to adapt the system quickly, but have no or limited experience on lean manufacturing issues. en_US
dc.description.degree Yüksek Lisans tr_TR
dc.description.degree M.Sc. en_US
dc.identifier.uri http://hdl.handle.net/11527/5879
dc.publisher Fen Bilimleri Enstitüsü tr_TR
dc.publisher Institute of Science and Technology en_US
dc.rights İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. tr_TR
dc.rights İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. en_US
dc.subject Yalın Üretim tr_TR
dc.subject Kanban tr_TR
dc.subject Milkrun. tr_TR
dc.subject Lean Manufacturing en_US
dc.subject Kanban en_US
dc.subject Milkrun. en_US
dc.title Kanban Kontrollü Mılkrun Döngülü Malzeme Besleme Sistemi: Tv Fabrikasında Bir Uygulama tr_TR
dc.title.alternative Material Replenishment System Via Kanban Controlled Milkrun Cycles: A Case Study At A Tv Factory en_US
dc.type Master Thesis en_US
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
11259.pdf
Boyut:
4.48 MB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
3.16 KB
Format:
Plain Text
Açıklama