İstanbul’da Açılacak Metro Tünellerinde Tbm (tünel Açma Makinesi) Performansını Tahmin Etmek İçin Yeni Bir Yaklaşım

dc.contributor.advisor Bilgin, Nuh tr_TR
dc.contributor.author Tüysüz, Levent tr_TR
dc.contributor.authorID 462230 tr_TR
dc.contributor.department Maden Kazı ve Mekanizasyonu tr_TR
dc.contributor.department Mine Mechanization and Excavation en_US
dc.date 2013 tr_TR
dc.date.accessioned 2013-02-28 tr_TR
dc.date.accessioned 2015-10-19T12:43:24Z
dc.date.available 2015-10-19T12:43:24Z
dc.date.issued 2013-03-01 tr_TR
dc.description Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2013 tr_TR
dc.description Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2013 en_US
dc.description.abstract Üsküdar-Ümraniye-Çekmeköy-Sancaktepe Metro Projesi 17 km uzunluğunda iki hattan oluşmaktadır. İşvereni İstanbul Büyükşehir Belediyesi, Yüklenicisi Doğuş İnşaat Şirketi olan bu projenin 38 ayda bitirilmesi planlanmaktadır. Jeoloji kumtaşı, arkozik kumtaşı çamurtaşı, silttaşı, şeyl, kireçtaşı, andezit ve kuvarsitik konglomeradan oluşmaktadır. Sık sık andezit dayklarıyla kesilen jeolojik birimler özellikle kırıklı çatlaklı geçiş zonlarına sahiptir. Nüfus yoğunluğunun fazla olduğu güzergah üzerinde örtü kalınlığı 10-80 metre arasında değişmektedir. Bazı bölgelerde eski su kuyularının varlığı tahmin edilmekte ve bu su kuyularının belirgin bir şekilde yeryüzü oturmalarına sebep olabileceği öngörülmektedir. Daha önce Kadıköy-Kartal Metro Projesinde kullanılan 6,57 metre çapındaki iki TBM, tünel kazısına hazır hale getirilmek üzere bakım ve onarım çalışmaları yapılmış ve yenilenmiştir. Üsküdar İstasyonu kazısı, deniz seviyesinin altında yapılacaktır Toplam 16 istasyon, 17 km lik anahat tüneli ve 2.5 km lik depo hattı bağlantı tünelinden oluşan bu projede anahat tünellerinin yaklaşık %80’inin kazısı (9166 m) TBM ile yapılacaktır. Daha önce Kadıköy-Kartal Metro Projesinde kullanılan 6,57 metre çapındaki iki TBM, tünel kazısına hazır hale getirilmek üzere bakım ve onarım çalışmaları yapılmış ve yenilenmiştir. Bu çalışma özetle, TBM kazısında kritik bölgeleri tanımlayan ve önceki çalışmalardan toplanan verileri esas alan TBM performansı tahmin metodolojisini ortaya koymaktadır. Bu metodolojide güzergah üzerindeki sondajların jeomekanik özelliklerini tek eksenli basınç dayanımı ve kaya kalite oranının belirlenmesiyle kaya yapısına ve formasyona göre spesifik enerjisi hesaplanmış TBM’in pasa basıçlı ya da açık modda çalışabilirliğini ve tahmini kazı süresi belirlenmiştir. tr_TR
dc.description.abstract Uskudar-Umraniye–Cekmekoy-Sancaktepe metro line of 17 km having two tubes is recently commissioned to Dogus Construction Company by Istanbul Metropolitan Municipality Authorities and it is intended to finish in 38 months. The geology is complex consisting of sandstone, arcosic sandstone mudstone, siltstone, shale, limestone, andesite, and quartzitic conglomerate. The geologic units are frequently cut by andesite dykes having significantly fractured contact zones. The area is highly populated, and the overburden changes between 10-80 m. It is predicted that in some areas it is likely that some ancient water wells exist which may cause some severe settlement problems. Two TBMs having diameters of 6.57 m already used in Kadikoy-Kartal metro tunnels are refurbished for the tunnel excavations. TBMs will excavate 9166 meters of tunnels between 12 metro stations. Uskudar station will be excavated under sea level. This study describes briefly the methodology based on the accumulated data from previous experiences to identify critical zones for TBM excavation. It is believed that the concept behind of proposed methodology will serve a sound basis for decision making for similar projects coming very soon. In this methodology, the data collected from drilling holes, was analyzed. This analysis contains geomechanical properties of the geological rock formation along the project route. Unaxial compressive strength, rock quality designation and adequate specific energy according to each rock formation were determined. In the light of this information, TBM working method (OPEN-EPB) predicted from excavation time, have been estimated. en_US
dc.description.degree Yüksek Lisans tr_TR
dc.description.degree M.Sc. en_US
dc.identifier.uri http://hdl.handle.net/11527/9769
dc.publisher Fen Bilimleri Enstitüsü tr_TR
dc.publisher Institute of Science and Technology en_US
dc.rights İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. tr_TR
dc.rights İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission en_US
dc.subject Üsküdar-Ümraniye-Çekmeköy Metrosu tr_TR
dc.subject Tünel açma makinesi(TBM) tr_TR
dc.subject ek eksenli basma dayanımı tr_TR
dc.subject spesifik enerji tr_TR
dc.subject TBM performansı tahmini tr_TR
dc.subject Uskudar-Umraniye-Cekmekoy Metro Project en_US
dc.subject Tunnel Boring Machine(TBM) en_US
dc.subject Unaxial Compressive Strength en_US
dc.subject spesicif energy en_US
dc.subject prediction of TBM performance en_US
dc.title İstanbul’da Açılacak Metro Tünellerinde Tbm (tünel Açma Makinesi) Performansını Tahmin Etmek İçin Yeni Bir Yaklaşım tr_TR
dc.title.alternative A Methodology Of Using Past Experiences In The Performance Prediction Of A Tbm In Istanbul Metro Tunnels en_US
dc.type Master Thesis en_US
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
13384.pdf
Boyut:
2.96 MB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
3.16 KB
Format:
Plain Text
Açıklama