Büyük ölçekli harita işlerinin birim fiyat analizlerinin yapılması ve irdelenmesi
Büyük ölçekli harita işlerinin birim fiyat analizlerinin yapılması ve irdelenmesi
dc.contributor.advisor | Algül, Emirhan | |
dc.contributor.author | Avcı, Kazım | |
dc.contributor.authorID | 100531 | |
dc.contributor.department | Geomatik Mühendisliği | tr_TR |
dc.date.accessioned | 2023-03-16T05:52:33Z | |
dc.date.available | 2023-03-16T05:52:33Z | |
dc.date.issued | 1999 | |
dc.description | Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 1999 | tr_TR |
dc.description.abstract | üyük ölçekli harita işlerinin birim fiyat analizlerinin yapılması amacıyla hazırlanan bu çalışmada; önce maliyet ve maliyet analizi kavramları açıklanmıştır. Birim maliyet elemanları ve birim maliyet hesabı anlatıldıktan sonra proje programlama tekniklerinden CPM ve PERT yöntemlerinden kısaca bahsedilmiştir. Büyük ölçekli harita işleri; nirengi işleri, poligon işleri, nivelman işleri, detay alımı işleri ve çizim işleri olmak üzere 5 bölüme ayrılmıştır. Harita üretim unsurları kodlandırıldıktan sonra işler iş kalemlerine ayrılarak herbir iş kalemi için ayrı ayrı iyimser süre (Ti), kötümser süre (Tk) ve ortalama süre (To) diye adlandırılan süre tahminlerinden yararlanılarak o iş kaleminin gerçekleşmesi için en olasılıklı süre (T) hesaplanmıştır. Herbir iş kalemi için o iş kaleminde yeralan personelin türü ve sayısı, araç ve gerecin türü ve sayısı ile kullanılan malzemenin miktarı ve hesaplanan en olasılıklı sürelerden yararlanarak birim maliyet hesabı yapılmıştır. Her bir iş kalemi için hesaplanan birim maliyetler ana iş kalemlerinde yerlerine yazılarak ana iş kalemlerinin maliyetleri hesaplanmış ve hesaplanan bu değerlere Genel Masraflar ve Yüklenici karı olarak hesaplanan değerin % 25'i eklenerek genel toplam adı altında ana iş kalemlerinin maliyetleri hesaplanmıştır. | tr_TR |
dc.description.abstract | The main purpose of this study is to analyse the unit cost of large scale map production. Firstly definitions and analysis of the cost are explained. After defining elements and calculation of the unit cost, modern project planning methods, CPM and PERT have been shortly described. The main activities in large scale map production are divided into five sections. Triangulation, polygonation, leveling, detail measurements and map drawing. Firstly map production elements are cooded, then the activities are divided into sub - works. For each sub - work, the optimistic time, the pessimistic time and the average time were estimated. Based on these parameters, the most probable time has been calculated. Unit costs were then calculated for each sub - work with respect to profession, number and working time of staff, equipment used and amount of materials. Using the costs of sub - works, the total costs for each main activity were calculated. 25 % were added on to the cost obtained as the profit of the firm. Then using these costs grand total was achived. | en_US |
dc.description.degree | Yüksek Lisans | tr_TR |
dc.identifier.uri | http://hdl.handle.net/11527/22951 | |
dc.language.iso | tr | |
dc.publisher | Fen Bilimleri Enstitüsü | tr_TR |
dc.rights | Kurumsal arşive yüklenen tüm eserler telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. | tr_TR |
dc.rights | All works uploaded to the institutional repository are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | en_US |
dc.subject | Birim fiyat | tr_TR |
dc.subject | Haritalar | tr_TR |
dc.subject | Maliyet analizi | tr_TR |
dc.subject | Unit price | en_US |
dc.subject | Maps | en_US |
dc.subject | Cost analysis | en_US |
dc.title | Büyük ölçekli harita işlerinin birim fiyat analizlerinin yapılması ve irdelenmesi | tr_TR |
dc.type | Master Thesis | tr_TR |