Melen Projesi Kapsamında Ayazağa Tünellerinde Delme – Patlatma İle Tünel Açımındaki Teknolojik Ve Çevresel Performansın İncelenmesi
| dc.contributor.advisor | Kuzu, Cengiz | |
| dc.contributor.author | Güçlü, Erim | |
| dc.contributor.department | Maden İşletme | |
| dc.contributor.department | Mineral Processing | |
| dc.date | 2008 | |
| dc.date.accessioned | 2008-06-30 | |
| dc.date.accessioned | 2015-09-17T12:43:05Z | |
| dc.date.available | 2015-09-17T12:43:05Z | |
| dc.date.issued | 2008-07-02 | |
| dc.description | Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2008 | |
| dc.description | Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2008 | |
| dc.description.abstract | Bu çalışmada, Melen Projesi kapsamında İstanbul’a içme suyu getirmek amacıyla açılan tünellerden olan Osmankuyu Tüneli’nde incelemeler yapılmıştır. Tünelcilik yönünden önemli olan havalandırma nakliyat tahkimat ve kazıyla ilgili gözlemler yapılmış ve bu temel işlerin Osmankuyu’da uygulanışı hakkında bilgiler sunulmuştur. Ayrıca bu işlere ait maliyet hesaplarına da değinilmiştir. Tünelde uygulanan kazı yöntemi tam cephe delme – patlatmadır. Çalışmada ayrıca delme ve patlatmaya ait teknolojik performanslarda değerlendirilmiştir. Osmankuyu Tüneli Ayazağa Köyü adındaki yerleşim alanının altından geçmektedir. Uygulanan delme – patlatma ile kazı yönteminin çevre sakinlerine verdiği rahatsızlık ve binalardaki etkisinin azaltılmasına yönelik çalışmalar yapılmış ve arazide gerekli ölçümler alınmıştır. Ölçümler sonucu patlatmaların binalara yıkıcı bir etkisi olmadığı görülmüştür. Fakat çevre sakinlerinin atımlardan aşırı şekilde etkilendiği gözlenmiştir ve çalışma bu etkiyi azaltması yönünde ilerlemiştir. Tam cephe patlatma yapılan tünelde bu sorunu ortadan kaldırmak için kısmi cephe delme patlatmaya geçilmiştir. Titreşim sürelerinin azaltılması ile rahatsızlık %50 oranında azaltılmıştır. | |
| dc.description.abstract | Osmankuyu Tunnel which was opened under the scope of Melen Project for carrying water to Istanbul was investigated in this study. Ventilation, transportation, support and excavation jobs and their applications which are important for tunnelling was observed. The informations gathered during observations was presented. Cost calculations of this jobs were mentioned. The applied excavation method was full face drilling and blasting in the tunnel. Also in this study the technological performances for drilling and blasting were evaluated. Osmankuyu Tunnel is passing under Ayazaga Koyu. Studies were done about the annoyance of drilling and blasting excavation method for people and effects of this method on buildings. Measurements were taken from the site. Acordoing to the measurements, blasts didn’t have distructive effects. But the people living on the site had annoyance. Also studies were to overcome this problem. The partical face drilling and blasting method was started to be used insted of full face drilling and blasting. The duration of vibrations so the annoyance were decreased %50 percent. | |
| dc.description.degree | Yüksek Lisans | |
| dc.description.degree | M.Sc. | |
| dc.identifier.uri | http://hdl.handle.net/11527/9388 | |
| dc.publisher | Fen Bilimleri Enstitüsü | |
| dc.publisher | Institute of Science and Technology | |
| dc.rights | İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. | |
| dc.rights | İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
| dc.subject | Tam cephe | |
| dc.subject | Kısmi cephe | |
| dc.subject | Delme – patlatma | |
| dc.subject | Çevresel etkiler | |
| dc.subject | Full face | |
| dc.subject | Partial face | |
| dc.subject | Drilling and blasting | |
| dc.subject | Environmental effects | |
| dc.title | Melen Projesi Kapsamında Ayazağa Tünellerinde Delme – Patlatma İle Tünel Açımındaki Teknolojik Ve Çevresel Performansın İncelenmesi | |
| dc.title.alternative | Investigation Of Technological And Environmental Performance In Tunnel Excavation With Drilling And Blasting Under The Scope Of Melen Project In Ayazaga Tunnels | |
| dc.type | Master Thesis |
