Tesis Yeri Değiştirilmesi Durumunda Karşılaşılan Sorunlar Ve Aydınlatma Sektöründe Bir Uygulama

dc.contributor.advisor Baskak, Murat tr_TR
dc.contributor.author Küpçü, Fatma Seyda tr_TR
dc.contributor.department Mühendislik Yönetimi tr_TR
dc.contributor.department Engineering Management en_US
dc.date 2007 tr_TR
dc.date.accessioned 2015-05-26T13:22:16Z
dc.date.available 2015-05-26T13:22:16Z
dc.description Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2007 tr_TR
dc.description Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2007 en_US
dc.description.abstract Bu çalışmadaki üretim yapan bir tesisin yer değişikliği esnasında ve sonrasında karşılaşılan zorlukların incelenmesi amaçlanmıştır. Bunun için öncelikli olarak yer değişikliği sürecinden önce düşünülecek yerleşim sorunu ve bu sorunun çözümü için kullanılan yer seçim teknikleri incelenmiştir. Ardından asıl konuyu oluşturan taşınma ile ilgili araştırma ve incelemeler sunulmuştur. Taşınma ile ilgili çalışmalar sonucunda, taşınma süreci; taşınma öncesi, taşınma anı ve taşınma sonrası olarak üç bölümde anlatılmıştır. Her üç bölümde de taşınma sürecinde yapılması gereken işlemler ve dikkat edilmediği takdirde ne gibi sorunlara neden olabileceği ile ilgili bilgiler verilmiştir. Tez konusu gereği çalışma birimi olarak aydınlatma sektöründe bir şirketin bir şehirden başka bir şehire taşınması ve tekrar üretime geçme süreci uygulama alanı olarak tespit edilmiştir. Firmanın taşınma öncesi ve sonrasında yapmış olduğu faaliyetler incelenmiş, taşınmayı yürüten proje sorumlusu ile bire-bir görüşmeler yapılmıştır. Ardından uygulamada yapılanlar teorik bilgiler ışığında Sonuç bölümünde tartışılmış, uygulamada eksik ve hatalı taraflar açıklanarak taşınmanın gereklilikleri belirtilmiştir. Taşınma süreci, üretim yapan tesisler için plansız bir şekilde yapılamayacağı, gerekli durumlarda profesyonel kişi veya gruplardan destek alınarak yapılması gerekliliği, özellikle tehlike arzeden ürünlerin kullanıldığı üretim yerleri için, vurgulanmıştır. Ayrıca gelecek çalışmalar için farklı araştırma konuları önerilmiştir. tr_TR
dc.description.abstract In this study, the difficulties which are faced as facility moving and after facility moving are analysed. Before the analysing moving and its activities first, the problem of facility layout and planning and the technics of solution of the problem of facility layout are researched. After that moving issue is researched and studied. After research, moving process is studied as in three part; premove, during move and postmove. In each part the moving activities which have to be done and the situtation when mandatory activities are not done is explained. A company which is in lighting sector is chosen as application area. The company is investigated while company was moving from one city to another city. The activities which company executed during the moving was studied and some meeting was arranged wtih the project manager who is responsible for moving. Finally activities in application was compared with theoretical knowledge and result of comparison is presented in conclusion section and missing points and mistakes which was in application is explained. In order to manage moving in best way, making plan for whole moving process and being supported by professionals when needed, especially chemical materials are used in sectors. Besides different search themes are suggested for next studies in conclusion section. en_US
dc.description.degree Yüksek Lisans tr_TR
dc.description.degree M.Sc. en_US
dc.identifier.uri http://hdl.handle.net/11527/3165
dc.publisher Fen Bilimleri Enstitüsü tr_TR
dc.publisher Institute of Science and Technology en_US
dc.rights İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. tr_TR
dc.rights İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. en_US
dc.subject Tesis yeri değişikliği tr_TR
dc.subject Taşınma Planı tr_TR
dc.subject Aydınlatma Sektörü tr_TR
dc.subject Taşınma Sonrası Durum tr_TR
dc.subject Facility Planning en_US
dc.subject Lighting Sector en_US
dc.subject Moving Plan en_US
dc.subject Postmove Situation en_US
dc.title Tesis Yeri Değiştirilmesi Durumunda Karşılaşılan Sorunlar Ve Aydınlatma Sektöründe Bir Uygulama tr_TR
dc.title.alternative Difficulties While Facilities Are Moving And An Application In Lighting Sector en_US
dc.type Master Thesis en_US
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
7367.pdf
Boyut:
516.94 KB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
3.14 KB
Format:
Plain Text
Açıklama