Danışman Yapım Yöneticisi Nin Ve Mimar In Görevleri İçin Kalite Yönetim Sistemi Araçları Modeli

dc.contributor.advisorÇıracı, A.murat
dc.contributor.authorSeyman, Tayibe
dc.contributor.authorID424717
dc.contributor.departmentYapı Bilimleri
dc.contributor.departmentYapı Bilimleri
dc.date2011
dc.date.accessioned2012-02-24
dc.date.accessioned2015-06-12T14:48:53Z
dc.date.available2015-06-12T14:48:53Z
dc.date.issued2012-06-04
dc.descriptionTez (Doktora) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2011
dc.descriptionThesis (PhD) -- İstanbul Technical University, Institute of Science and Technology, 2011
dc.description.abstractBu çalışmada, Danışman Yapım Yönetimi proje teslim sisteminde projenin ilk karar aşamasından itibaren yer alan Danışman Yapım Yöneticisi’nin (DYY) ve Mimar’ın görevleri, her bir proje evresini başarıyla tamamlayabilmek ve başarılı binayı gerçekleştirebilmek üzere, kalite yönetim sistemi araçları (KYSA) ile modellenmiştir. Yapım öncesinde yerine getirilmesi gereken görevlerin proje başarısını etkileme gücü üzerinde durularak, yapım öncesinden itibaren gerekleri açık ve net ortaya konulmuş görev tanımlarına olan ihtiyaca KYSA’nın cevap olabilirliği araştırılmış ve model oluşturulmuştur. Önerilen model geliştirilirken DYY’nin görevleri AIA, C132-2009 Malsahibi DYY sözleşmesinde yer alan şekliyle, Mimar’ın görevleri ise AIA, B132-2009 Malsahibi Mimar sözleşmesinde yer alan şekliyle proje başarısını etkileme açısından analiz edilmiş, tanımlardaki eksiklikleri tespit edilmiş ve herbir görev için KYSA önerileri getirilmiştir. Önerilen model hem DYY için hem de Mimar için ayrı ayrı ortaya konulmuş olup, modelde her ikisi için de önerilen KYSA’lar olan şartname, prosedür veya formların DYY Malsahibi sözleşmesinin ve Mimar Malsahibi sözleşmesinin ekleri olması kurgulanmıştır.
dc.description.abstractIn this study, for the construction management as advisor project delivery system, both the tasks of CMa and Architect, involving in the construction project due to the very first decision, are modelled by the quality management system tools (QMST) in order to achieve each of the project phases successfully and accordingly to achieve the successful building. Meanwhile, the importance of tasks’ performances of the pre-construction phase are emphasized since they affect the overall project success dramaticaly. The QMST are investegated for a worthwhile responce for the need of clarification of task definitions. In this way the proposed model is generated. While improving the proposed model, the tasks of CMa which are determined in AIA, C132-2009 CMa-Owner contract document and the tasks of Architect which are determined in AIA B132-2009 Architect-Owner contract document, are analyzed, then their omisions are detected and subsequently the QMS tools are proposed for the each task. The proposed model is defined for the CMa’s and the Architect’s tasks separately and the QMST such as specifications, procedures and forms are suggested to be the exhibits of CMa-Owner contract and Architect-Owner contract as well.
dc.description.degreeDoktora
dc.description.degreePhD
dc.identifier.urihttp://hdl.handle.net/11527/4966
dc.publisherFen Bilimleri Enstitüsü
dc.publisherInstitute of Science and Technology
dc.rightsİTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır.
dc.rightsİTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.
dc.subjectdanışman yapım yönetimi sözleşmeleri
dc.subjectkalite yönetim sistemi
dc.subjectdanışman yapım yöneticisinin görevleri
dc.subjectmimarın görevleri
dc.subjectAIA
dc.subjectconstruction management contracts
dc.subjectquality management system
dc.subjectconstruction manager as advisor’s tasks
dc.subjectarchitect’s tasks
dc.subjectAIA
dc.titleDanışman Yapım Yöneticisi Nin Ve Mimar In Görevleri İçin Kalite Yönetim Sistemi Araçları Modeli
dc.title.alternativeModeling The Quality Management System Tools For Both The Tasks Of The Architect And The Construction Manager As Advisor
dc.typeDoctoral Thesis

Dosyalar

Orijinal seri

Şimdi gösteriliyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
Ad:
12408.pdf
Boyut:
12.6 MB
Format:
Adobe Portable Document Format

Lisanslı seri

Şimdi gösteriliyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
Ad:
license.txt
Boyut:
3.16 KB
Format:
Plain Text
Açıklama