Marmaray Projesi Sirkeci İstasyonu Pilot Tünel Kazılarına Bağlı Gelişen Yüzey Deformasyonlarının Değerlendirilmesi

dc.contributor.advisor Mahmutoğlu, Yılmaz tr_TR
dc.contributor.author Topal, Candaş tr_TR
dc.contributor.authorID 10039572 tr_TR
dc.contributor.department Jeoloji Mühendisliği tr_TR
dc.contributor.department Geological Engineering en_US
dc.date 2014 tr_TR
dc.date.accessioned 2017-03-09T12:08:35Z
dc.date.available 2017-03-09T12:08:35Z
dc.date.issued 2014-06-16 tr_TR
dc.description Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2014 tr_TR
dc.description Thesis (M.Sc.) -- İstanbul Technical University, Instıtute of Science and Technology, 2014 en_US
dc.description.abstract Bu tezin amacı Marmaray Projesi kapsamında yapımı gerçekleşen Sirkeci İstasyonu Pilot tünel kazılarına bağlı olarak gelişen yüzey deformasyonlarının, hattın jeolojik özelliklerini de dikkate alarak jeoteknik parametrelere göre incelemek ve ikiz pilot tünel kazılarına bağlı gelişen yüzey deformasyonlarını analiz etmektir. Tez kapsamında bölgenin jeolojik özellikleri, bölgedeki mühendislik uygulamaları ve uygulama sırasında oluşan çevresel etkileri ortaya koyan izleme verileri birlikte değerlendirilmiştir. Bu analiz ve değerlendirmeler sonucunda şu bulgular elde edilmiştir;Sirkeci İstasyonu’na ait yeraltı açıklıkları proje kesiti kazılarına geçilmeden önce pilot tünel kazılarının gerçekleştirilmesi, ortam özellikleri ve davranışlarının belirlenmesi, kazı kaynaklı yüzey deformasyonlarının kestirimi ve denetimi açısından büyük yarar sağlamıştır. Pilot tünel kazıları neticesinde, istasyonun yerleşeceği ekseni oluşturan jeolojik ortam görülerek detaylı olarak tanımlanabilmiş, ileride oluşabilecek yüzey ve yeraltı deformasyonları sağlıklı bir şekilde kestirilebilmiştir.İnceleme alanını kaplayan Arkeolojik Dolgunun, boşluklu ve çoğunlukla kemerleşmeye müsade etmeyen bir yapı olduğu belirlenmiştir.Kemerleşmeye müsade etmeyen Arkeolojik Dolgunun içerisindeki yeraltı suyunun tünellere drenajı neticesinde bazı lokasyonlarda konsolidasyon oturmalarının oluştuğu belirlenmiştir.İncelenen kesitlerden henüz tünel kazıları gerçekleşmeden önce, jeolojik ortamın Batı ve Doğu Havalandırma Şaftları, İstasyon Kuzey Girişi’nin bir bölümü ve Doğu Havalandırma Bacasına komşu Kaçış Şaftı kazısı tarafından örselendiği gerçeği inceleme sırasında göz önünde bulundurulmuştur.Bazı kesitler üzerine denk gelen yüzey oturmaları, 1. Pilot Tünelin (Güney Pilot Tünel) kazısı sırasında, bu tünel üzerinde, 2. Pilot Tünelin (Kuzey Pilot Tünel) kazısının sonrasında da ise 2. Pilot Tünel üzerinde maksimum değere ulaştığı belirlenmiştir. Bunun sebebinin bir önceki maddede bahsedilen ilk örselenmeler olduğu ve arkelojik dolgunun kemerleşmeye müsaade etmeyen yapısından dolayı sağlam bir kaya yapısı gibi hareket etmek yerine daha çok akıcı bir malzeme gibi hareket etmesine bağlanmıştır.Havalandırma Bacaları, Kaçış Şaftı ve İstasyon Kuzey Girişi kazılarının bulunduğu kısımların diğer bölgelere göre ilk kazılardan daha fazla etkilenerek örselendiği görülmüştür. Proje kapsamında yüzeydeki binaların oturma eğrileri detaylı bir şekilde incelenmiş ve gerekli görülen lokasyonlarda zemin iyileştirme çalışmaları yapılmıştır.Bölgedeki bazı binaların zemininde gelişen konsolidasyon oturmalarını yavaşlatmak için, bu binaların temeline yönlü sondajlar ile ulaşılmış ve yeraltı suyunun tünellere drenajı nedeniyle zemin suyu kaybına bağlı oluşan konsolidasyon oturmalarını engellemek için yüzeyde kurulan bir sistem ile zemine su enjekte edilip, su seviyesi düşümü kontrol altında tutulmuştur.Nihai sonuç olarak, yüzey deformasyonlarının kritik olduğu tünel projelerinde, jeolojik ortamın tünel kazılarına nasıl tepki verdiğini incelemek ve ileride oluşabilecek deformasyonları tahmin edebilmek için önceden açılacak pilot tünel kazılarının kent içi kazılarında göz önünde tutulmasının yararlı olduğu görülmüştür. tr_TR
dc.description.abstract The aim of this thesis is to analyze ground surface deformations resulted in the pilot tunnel excavation, which were executed during the Marmaray Project- Sirkeci Station’s construction. Within the thesis research work, local geological parameters were evaluated together with monitoring data and environmental effects of the engineering applications. As a result of these comparisons, the following conclusions were observed.The pilot tunnel excavations provided very valuable information regarding the behavior of the surrounded rock and tunnel induced surface deformations and their prediction and monitoring methods before start the project sections of the Sirkeci Station’s underground openings. The form of the archeological filling material, which covers the research area, was observed as in porous and non-bridging structure.Due to the drainage of the underground water from archeological filling layer to the tunnels, in some locations consolidation settlements were observed.The primary ground deformations due to the East- West Ventilation Shafts, Escape Shaft and North Entrance excavations were considered while studying the surface settlements which occurred on studied section lines.Ground surface settlements on some section lines were observed as follows; during the passing of first pilot tunnel, surface settlement were occurred above the first pilot tunnel and during passing the second passing pilot tunnel this settlement reached to the maximum value. This circumstance was expressed by the behavior of the Archeological Filling Material, which has very heterogeneous and cavernous structure and its matrix does not allow to bridging after long term drainage.It was observed that the nearest locations to the Ventilation Shafts, Escape Shaft and Station North Entrances were affected by the primary excavationsDuring the project execution phase, the existing surface structures were monitored closely and soil improvement works were conducted for required locations. In some buildings, consolidation settlements were observed due to the drainage of the groundwate to the tunnels. In order to minimize the consolidation settlements of these buildings, inclined bore holes were drilled towards to the building’s ground points, where drainage occurs in higher values, and with the help of water injection system, which was established on surface, continuous water injection were applied to these ground points to keep stable the underground water table. Consequently it shall be stated that in critical urban infrastructure projects, excavation of the pilot tunnels, as primary tunnels, plays very important role to understand and predict the behavior of the surrounded geo-environment. en_US
dc.description.degree Yüksek Lisans tr_TR
dc.description.degree M.Sc. en_US
dc.identifier.uri http://hdl.handle.net/11527/13822
dc.publisher Fen Bilimleri Enstitüsü tr_TR
dc.publisher Institute of Science And Technology en_US
dc.rights İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. tr_TR
dc.rights İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. en_US
dc.subject İkiz Tünel Pilot Tünel Yüzey Deformasyonu tr_TR
dc.subject Twin Tunnels Pilot Tunnel Surface Deformation en_US
dc.title Marmaray Projesi Sirkeci İstasyonu Pilot Tünel Kazılarına Bağlı Gelişen Yüzey Deformasyonlarının Değerlendirilmesi tr_TR
dc.title.alternative Assesment Of The Pilot Tunnel Induced Ground Surface Deformations Of The Marmaray Project Sirkeci Station en_US
dc.type Master Thesis en_US
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
10039572.pdf
Boyut:
8.48 MB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
3.16 KB
Format:
Plain Text
Açıklama