Buhar Çevrimli Kojenerasyon Sistemlerinin Termoekonomik Optimizasyonu

dc.contributor.advisorDerbentli, Taner
dc.contributor.authorMete, Seher
dc.contributor.authorID422825
dc.contributor.departmentIsı Akışkan
dc.contributor.departmentHead and Fluids
dc.date2012
dc.date.accessioned2012-02-02
dc.date.accessioned2015-05-15T07:32:29Z
dc.date.available2015-05-15T07:32:29Z
dc.date.issued2012-05-24
dc.descriptionTez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2012
dc.descriptionThesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2012
dc.description.abstractBu çalışmada, yakıt olarak kömür kullanan buhar türbinli bir kojenerasyon sisteminin termoekonomik incelemesi yapılmıştır. Sistemdeki tüm akıların birim ekserji maliyetleri ekserji ve maliyet denge denklemlerini kullanarak elde edilmiştir. Bileşik ısı-güç üretim sisteminin tüm elemanları için ekserji kırımları, ekserji verimleri ve eksergoekonomik faktörler hesaplanmış ve elemanlar bu ölçütlere göre değerlendirilmiştir. Kazandaki ekserji kırımının diğer elemanlara göre daha fazla olduğu gözlemlenmiştir. Kazan ve buhar türbininin verimleri ile maliyetleri değiştirilmiş, elektriğin birim ekserji maliyetini en düşük seviyeye getirecek kazan ve türbin verimi elde edilmiştir. Elektrik üretim bedeli ayrıca, bir değere getirilmiş maliyet yöntemiyle hesaplanmıştır. Tüm bu yöntemlerden elde edilen sonuçlara göre ele alınan sistemin elektrik maliyeti 0,12 TL/kWh olarak bulunmuş olup, uygun bir değerdir. Sistemlerin olurluluğunun değerlendirilmesinde önemli bir parametre olan geri ödeme süresi, bu çalışmada ele alınan sistem için 1,6 yıl olarak hesaplanmış ve sistemin kurulmasının uygun olabileceği sonucuna varılmıştır.
dc.description.abstractIn this study, thermoeconomic investigation of a coal burning steam cycle cogeneration system has been realized. Unit exergetic costs of all system flows has been obtained by using the exergy and cost balance equations. For all elements of the combined heat and power generation system, exergy destructions, exergetic efficiencies and exergoeconomic factors have been found and according to these criteria system elements have been evaluated. It is observed that the exergy destruction at the boiler is more than the other system elements. The efficiencies and investment costs of boiler and steam turbine have been changed and the efficiency values, which makes the exergetic cost of electricity minimum, have been found. Additionally electricity cost has been found with the levelized life cycle cost method. According to the results of all these methods, electricity cost of the system is 0,12 TL/kWh and this is an acceptable value. The pay back period which is an important parameter for the evaluation of the system feasibility has been calculated as 1,6 years which is a good duration for such systems.
dc.description.degreeYüksek Lisans
dc.description.degreeM.Sc.
dc.identifier.urihttp://hdl.handle.net/11527/1901
dc.publisherFen Bilimleri Enstitüsü
dc.publisherInstitute of Science and Technology
dc.rightsİTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır.
dc.rightsİTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.
dc.subjectTermoekonomi
dc.subjectekserji
dc.subjectbileşik ısı güç santrali
dc.subjectkömür yanması
dc.subjectThermoeconomy
dc.subjectexergy
dc.subjectcombined heat power plant
dc.subjectcoal combustion
dc.titleBuhar Çevrimli Kojenerasyon Sistemlerinin Termoekonomik Optimizasyonu
dc.title.alternativeThermoeconomic Optimization Of Steam Cycle Cogeneration Systems
dc.typeMaster Thesis

Dosyalar

Orijinal seri

Şimdi gösteriliyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
Ad:
12225.pdf
Boyut:
2.08 MB
Format:
Adobe Portable Document Format