İnşaat Planlama Teknikleri Ve Yeni Yaklaşımlar – Türk Yüklenici Firmaları Alan Çalışması

dc.contributor.advisor Dikbaş, Attila tr_TR
dc.contributor.author Konakcı, Cenk tr_TR
dc.contributor.department Proje Yapım Yönetimi tr_TR
dc.contributor.department Construction Management en_US
dc.date 2006 tr_TR
dc.date.accessioned 2015-08-12T13:53:25Z
dc.date.available 2015-08-12T13:53:25Z
dc.description Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2006 tr_TR
dc.description Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2006 en_US
dc.description.abstract Proje planlama teknikleri, projelerin planlanması, programlanması ve kontrolünde kullanılmaktadır. Proje planlama ve programlama tekniklerinin geliştirilmesiyle ilgili çalışmalar 1950’li yılları sonlarına rastlamaktadır. Bu konuda geliştirilen temel yöntemler, Bar Chart, PERT, CPM ve Lineer planlama teknikleridir. Geleneksel proje planlama tekniği olan Kritik Yörünge Metodu (CPM) ve PERT, önceden belirlenemeyen kısıtlar ile başa çıkamadığı ve ifade etme zorluğu sebeplerinden dolayı çok fazla şekilde eleştirilmiştir. Bu eksikliklerle başa çıkmak için inşaat alanında bir çok araştırma yapılmış ve aralarında yeni planlama dizaynlarını içeren bir çok ilerleme ile sonuçlanmıştır. Simülasyon modeli, 4D proje planlaması ve Virtual Reality (VR) yeni nesil planlama tekniklerine öncülük etmektedir. Bu teknikler, bina inşaatının, zamanın dördüncü boyutundan görünüşü şeklinde bir görsel simülasyon sağlamaktadır. Yeni nesil planlama teknikleri, inşaat alanındaki profesyoneller için potansiyel bir yönetim aracı haline gelmiştir. Türk inşaat sektöründeki konu ile ilgili durumu açıklamak üzere tez kapsamında gerçekleştirilen alan araştırmasından elde edilen bulguların genel değerlendirilmesi yapılmıştır. Ayrıca yapılan alan araştırmasının sonucu, yurtdışında yapılan araştırmaların sonucuyla karşılaştırılmıştır. Böylece Türk inşaat sektöründeki firmalarla yurtdışındaki inşaat firmalarının proje planlama tekniklerine bakış açışı karşılaştırılmıştır. tr_TR
dc.description.abstract The construction industry is one of the biggest in employment opportunities beyond other industrial sectors in most of the countries. Different production types can be applied at the same time in construction industry such as sequence production, production for market, production for owner, production for project type. Furthermore, construction industry is a complex and heterogeneous sector. Therefore it consists too much risk factor. To complete the projects within expected cost, time and quality limits, the risk factor should be reduced. Contracts are the best documents which can be used for reducing the risk. Therefore contract administration is as important as the contract is. If a well developed contract can not be managed as well as it has to be, parties should take more responsibilities. That’s why it is determined to make a research in contract administration which has an important effect in construction project management. The research is supported with a case study about a well managed contract administration process. The reason for making a case study is that the theoretical information will not be enough for such an important subject, it should be supported with an applied project. en_US
dc.description.degree Yüksek Lisans tr_TR
dc.description.degree M.Sc. en_US
dc.identifier.uri http://hdl.handle.net/11527/8273
dc.publisher Fen Bilimleri Enstitüsü tr_TR
dc.publisher Institute of Science and Technology en_US
dc.rights İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. tr_TR
dc.rights İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. en_US
dc.subject CPM tr_TR
dc.subject PERT tr_TR
dc.subject 4D tr_TR
dc.subject Simülasyon tr_TR
dc.subject Planlama Teknikleri tr_TR
dc.subject Virtual Reality tr_TR
dc.subject Construction Scheduling en_US
dc.subject CPM en_US
dc.subject PERT en_US
dc.subject 4D en_US
dc.subject Simulation en_US
dc.subject Virtual Reality en_US
dc.title İnşaat Planlama Teknikleri Ve Yeni Yaklaşımlar – Türk Yüklenici Firmaları Alan Çalışması tr_TR
dc.title.alternative Construction Scheduling Techniques And New Approaches – Field Study Of Turkish Construction Firms en_US
dc.type Master Thesis en_US
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
3821.pdf
Boyut:
2.07 MB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
3.14 KB
Format:
Plain Text
Açıklama