Bina Yapımında Tekrarlanan İşleri Oluşturan Sebepler Ve İnşaat Maliyetlerine Etkileri
Bina Yapımında Tekrarlanan İşleri Oluşturan Sebepler Ve İnşaat Maliyetlerine Etkileri
dc.contributor.advisor | Çıracı, Murat | tr_TR |
dc.contributor.author | Güray, Cem | tr_TR |
dc.contributor.department | Proje Yapım Yönetimi | tr_TR |
dc.contributor.department | Construction Management | en_US |
dc.date | 2004 | tr_TR |
dc.date.accessioned | 2015-08-12T13:53:28Z | |
dc.date.available | 2015-08-12T13:53:28Z | |
dc.description | Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2004 | tr_TR |
dc.description | Thesis (M.Sc.) -- İstanbul Technical University, Institute of Science and Technology, 2004 | en_US |
dc.description.abstract | Bu çalışma, öncelikle, Türkiye inşaat sektöründeki firmaların, tekrarlanan işleri oluşturan sebepler hakkındaki düşüncelerinin belirlenmesini amaçlamaktadır. Ayrıca tekrarlanan işlerden dolayı oluşan maliyetlerin Türkiye inşaat sektöründeki büyüklüğünü de belirlemeyi hedeflemektedir. Tez kapsamında yürütülen alan araştırmasının bulgularına baktığımızda en fazla tekrarlanan iş “Mühendislik Tasarımları & Yeniden Gözden Geçirmeler” sebebinden kaynaklanmaktadır. Bu yüzden, özellikle hızlandırılmış süreçle ilerleyen projelerde, mühendislik tasarımlarının standart uygulamalar ile gözden geçirilerek geliştirilmesi ve herbir kilometre taşının kontrol edilebilmesi için yeterli zaman ve kaynak ayrılması gerekmektedir. Tekrarlanan işleri azaltmak için yeterli zaman ve kaynak ayırmayan firmalar ise, zarar etmeye devam edecekler ve inşaat sektöründe rekabet güçlerini kaybedeceklerdir. | tr_TR |
dc.description.abstract | This study first of all, aims to determine the opinions of firms acting in Turkish Construction Market about the reasons causing reworks during building construction. The study also aims to find out the overall financial amount of these reworks in Turkish Construction Market. After the research prepared as the field study of the thesis, it is observed that the reworks are mostly caused by “Engineering & Reviews” That’s why, especially for the management projects designed with accelerated processes, enough resources and time should be planned for the engineering designs to be reviewed and developed, with standard applications, in each step of the project. Firms that do not spare enough time and resource to reduce the amount of reworks will continue to suffer and loose their power to compete with others. | en_US |
dc.description.degree | Yüksek Lisans | tr_TR |
dc.description.degree | M.Sc. | en_US |
dc.identifier.uri | http://hdl.handle.net/11527/8289 | |
dc.publisher | Fen Bilimleri Enstitüsü | tr_TR |
dc.publisher | Institute of Science and Technology | en_US |
dc.rights | İTÜ tezleri telif hakkı ile korunmaktadır. Bunlar, bu kaynak üzerinden herhangi bir amaçla görüntülenebilir, ancak yazılı izin alınmadan herhangi bir biçimde yeniden oluşturulması veya dağıtılması yasaklanmıştır. | tr_TR |
dc.rights | İTÜ theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | en_US |
dc.subject | Tekrarlanan iş | tr_TR |
dc.subject | Tekrarlanan iş maliyetleri. | tr_TR |
dc.subject | Rework | en_US |
dc.subject | Rework costs. | en_US |
dc.title | Bina Yapımında Tekrarlanan İşleri Oluşturan Sebepler Ve İnşaat Maliyetlerine Etkileri | tr_TR |
dc.title.alternative | The Reasons Causing Reworks During Building Construction And Their Influence On Construction Cost | en_US |
dc.type | Master Thesis |