Assessment of geothermal power potential in Buyuk Menderes Basin, Turkey

dc.contributor.author Yamanlar, Şenol,
dc.contributor.author Korkmaz Başel, Emine Didem
dc.contributor.author Serpen, Ümran
dc.contributor.authorID https://orcid.org/0000-0001-7713-9551
dc.contributor.department Petroleum and Natural Gas Engineering Department
dc.date.accessioned 2024-05-28T11:05:12Z
dc.date.available 2024-05-28T11:05:12Z
dc.date.issued 2020
dc.description.abstract Turkey’s installed geothermal capacity for power generation as of December 2019 is 1500 MWe. Most of this installed capacity is generated by the power plants located in the Buyuk Menderes graben. Geologically Buyuk Menderes graben is a huge structure having several discovered geothermal resources and can be considered as a geothermal basin. The aim of this study is to estimate the geothermal power potential of Buyuk Menderes graben. To achieve this object, a stochastic methodology, which is used to evaluate hydrocarbon-bearing basins, is adapted from the oil and natural gas industry. This methodology provides a way to quantify the geothermal potential in a range of possible values by evaluating the individual fields in the basin using stored heat technique. A total of 34 (21 proven and 13 probable occurrences) geothermal fields having medium to high temperature (T ≥ 100 °C) values are evaluated using the Monte Carlo Simulation technique. In these simulations, available geological, geochemical, geophysical data are used along with the data obtained from the drilled wells in the region. The power potential (MWe) values for 21 proven fields in terms of P10, P50 and P90 values are determined to be 888, 1077 and 1311 MWe, respectively. Considering the 13 probable occurrences along with the proven fields, the lower and upper limits of the total power potential (P10 and P90) are 1156 and 1580 MWe, respectively. Moreover, the power potentials are also evaluated under the presence of uncertainty. By assigning 5/13, 6/13, and 7/13 probability values for the 13 probable occurrences, overall geothermal power potential P10 values are estimated as 1041, 1075, and 1101 MWe, respectively.
dc.identifier.citation Senol, Y., Korkmaz, E.D. and Serpen, U. (2020). "Assessment of geothermal power potential in Buyuk Menderes Basin, Turkey". Geothermics, 88. https://doi.org/10.1016/j.geothermics.2020.101912
dc.identifier.issn 1879-3576
dc.identifier.uri http://hdl.handle.net/11527/24910
dc.identifier.uri https://doi.org/10.1016/j.geothermics.2020.101912
dc.language.iso en_US
dc.publisher Elsevier
dc.relation.ispartof Geothermics
dc.rights.license CC BY
dc.sdg.type Goal 9: Industry, Innovation and Infrastructure
dc.subject geothermal resources
dc.subject jeotermal kaynaklar
dc.subject geothermal engineering
dc.subject jeotermal mühendisliği
dc.subject power resources
dc.subject güç kaynakları
dc.subject Buyuk Menderes graben
dc.subject Büyük Menderes grabeni
dc.subject Turkey
dc.subject Türkiye
dc.title Assessment of geothermal power potential in Buyuk Menderes Basin, Turkey
dc.type Article
dspace.entity.type
Dosyalar
Orijinal seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.alt
Ad:
2020.101912.pdf
Boyut:
8.23 MB
Format:
Adobe Portable Document Format
Açıklama
Lisanslı seri
Şimdi gösteriliyor 1 - 1 / 1
thumbnail.default.placeholder
Ad:
license.txt
Boyut:
1.58 KB
Format:
Item-specific license agreed upon to submission
Açıklama