Yayın:
Multiprocessor task scheduling in multistage hybrid flow-shops: A parallel greedy algorithm approach

dc.contributor.authorKahraman, Cengiz
dc.contributor.authorEngin, Orhan
dc.contributor.authorKaya, Ihsan
dc.contributor.authorElif Öztürk, R.
dc.date.accessioned2026-01-25T05:43:50Z
dc.date.issued2010-09-01
dc.description.abstractHybrid flow shop scheduling problems have a special structure combining some elements of both the flow shop and the parallel machine scheduling problems. Multiprocessor task scheduling problem can be stated as finding a schedule for a general task graph to execute on a multiprocessor system so that the schedule length can be minimized. Hybrid Flow Shop Scheduling with Multiprocessor Task (HFSMT) problem is known to be NP-hard. In this study we present an effective parallel greedy algorithm to solve HFSMT problem. Parallel greedy algorithm (PGA) is applied by two phases iteratively, called destruction and construction. Four constructive heuristic methods are proposed to solve HFSMT problems. A preliminary test is performed to set the best values of control parameters, namely population size, subgroups number, and iteration number. The best values of control parameters and operators are determined by a full factorial experimental design using our PGA program. Computational results are compared with the earlier works of Oguz et al. [1,3], and Oguz [2]. The results indicate that the proposed parallel greedy algorithm approach is very effective in terms of reduced total completion time or makespan (C"m"a"x) for the attempted problems.
dc.description.urihttps://doi.org/10.1016/j.asoc.2010.03.008
dc.description.urihttps://dx.doi.org/10.1016/j.asoc.2010.03.008
dc.description.urihttps://avesis.yildiz.edu.tr/publication/details/51cfdd3e-04ed-4af7-abfd-9ef89fbe02bd/oai
dc.description.urihttps://hdl.handle.net/20.500.12395/25093
dc.identifier.doi10.1016/j.asoc.2010.03.008
dc.identifier.endpage1300
dc.identifier.issn1568-4946
dc.identifier.openairedoi_dedup___::6fb3dfd7c16f24d2a044d6abf6388769
dc.identifier.orcid0000-0002-7250-0317
dc.identifier.orcid0000-0002-0142-4257
dc.identifier.startpage1293
dc.identifier.urihttps://hdl.handle.net/11527/47365
dc.identifier.volume10
dc.language.isoeng
dc.publisherElsevier BV
dc.relation.ispartofApplied Soft Computing
dc.rightsOPEN
dc.subjectMultiprocessor Tasks Scheduling Problems
dc.subjectParallel Greedy Algorithm
dc.subjectHybrid Flow Shop
dc.titleMultiprocessor task scheduling in multistage hybrid flow-shops: A parallel greedy algorithm approach
dc.typeArticle
dspace.entity.typePublication

Dosyalar

Koleksiyonlar