Yayın:
The performance prediction of impact hammers from Schmidt hammer rebound values in Istanbul metro tunnel drivages

Yükleniyor...
Küçük Resim

Kurum Yazarları

Item type:Araştırmacı/Yazar,
Çopur, Hanifi
Prof. Dr.

Danışman

Bölüm / Program

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Elsevier BV

Türü

Araştırma Projeleri

Akademik Birimler

Dergi Sayısı

Özet

The construction of the first metro line in Istanbul was realized between Galata and Beyoglu by a French Engineer Henry Gavand in January 1875. Six different metro projects were submitted since then to the Turkish authorities. The construction of 7-km metro tunnels phase 1 started in 1992 and the metro line of the phase 1 is opened to the service in 2000. The tunnels of the phase 2 between Taksim and Yenikapi are under construction. This paper summarizes the construction methods of the Istanbul metro tunnels, the performance of the impact hammers, the factors effecting daily advance rates and the previous studies on Schmidt hammer test and performance prediction of impact hammers. At the end, a prediction model concerning instantaneous breaking rates of hydraulic impact hammers from Schmidt hammer rebound values is explained in detail.

Tanım

Dergi veya Seri

Tunnelling and Underground Space Technology

ISSN

0886-7798

ISBN

Haklar

CLOSED

Anahtar Kelimeler

Alıntı

Koleksiyonlar

Onay

Gözden geçir

Tamamlayıcı Bilgiler

Referans Gösteren

Related Patent

Related Goal

2
Görüntülenme
0
İndirme
Altmetric
Dimensions
PlumX Metrikleri
BIP! Indicators
Google Scholar
Scholar'da Ara ↗