Yayın:
Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings

dc.contributor.authorArtan, Deniz
dc.contributor.authorErgen, Esin
dc.contributor.authorKula, Behlul
dc.contributor.authorGüven, Gürşans
dc.contributor.ituauthorArtan, Deniz
dc.contributor.ituauthorErgen, Pehlevan Esin
dc.date.accessioned2026-01-26T02:51:22Z
dc.date.issued2022-04-21
dc.description.abstractThe feedback obtained from occupants regarding their comfort needs and performance of buildings is critical for assessing occupant satisfaction, identifying the operation and maintenance (O&M) issues in time and for improving resource efficiency in buildings. Current facility management (FM) systems and occupant feedback collection practices, however, have limitations in supporting effective decision-making in FM, as they lack the necessary contextual data related to the occupant feedback (e.g., building geometry, systems, elements). Building Information Modeling (BIM)-enabled FM systems are used for combining different types of FM information with building models; however, occupant feedback is still not effectively utilized in FM since it is not integrated with BIM. In this study, a BIM integrated post-occupancy evaluation system prototype is developed for: (1) collecting occupant feedback along with the contextual information related to the feedback items in a structured way, and (2) presenting this information as integrated with BIM to the facility managers. This enables conducting spatio-temporal queries and supports effective decision-making by visualizing the collected feedback. The prototype was designed by using qualitative shadowing with FM teams to identify information needs and use case analysis to determine how contextual data integrated with BIM could be collected from office occupants who are non-technical persons with limited information on building models. This paper identifies the FM query categories that are required to process the occupant feedback and describes the RateWorkSpace prototype developed for office buildings. The deployment of the prototype in a real-world office demonstrates that the proposed system is applicable, practical, usable, and that real-time building performance data can be both collected and analysed with the developed system. This has the potential to increase the effectiveness of the FM and O&M processes, and help to create office spaces with optimized energy use and occupant comfort that also supports occupant well-being and productivity.
dc.description.urihttps://doi.org/10.36680/j.itcon.2022.022
dc.description.urihttps://dx.doi.org/10.60692/tre3k-1sp15
dc.description.urihttps://dx.doi.org/10.60692/vayqa-fgn59
dc.description.urihttps://www.itcon.org/paper/2022/22
dc.description.urihttp://hdl.handle.net/10679/8670
dc.description.urihttps://aperta.ulakbim.gov.tr/record/254439
dc.identifier.doi10.36680/j.itcon.2022.022
dc.identifier.eissn1874-4753
dc.identifier.endpage485
dc.identifier.openairedoi_dedup___::cb80c9d41dc3796b48fc85edf8ca220c
dc.identifier.orcid0000-0003-4614-3245
dc.identifier.orcid0000-0001-6413-4647
dc.identifier.orcid0000-0002-8143-1050
dc.identifier.startpage441
dc.identifier.urihttps://hdl.handle.net/11527/58174
dc.identifier.volume27
dc.language.isoeng
dc.publisherInternational Council for Research and Innovation in Building and Construction
dc.relation.ispartofJournal of Information Technology in Construction
dc.rightsOPEN
dc.sdg.typeGoal 11: Sustainable Cities and Communities
dc.subjectWorkspace Environment
dc.subjectOffice buildings
dc.subjectPhysical Work Environment
dc.subjectSocial Psychology
dc.subjectResource (disambiguation)
dc.subjectSystem deployment
dc.subjectSocial Sciences
dc.subjectImpact of Workspace Environment on Work Performance
dc.subjectIoT Integration
dc.subjectBuilding Information Modeling in Construction Industry
dc.subjectSystems engineering
dc.subjectFOS: Economics and business
dc.subjectEngineering
dc.subjectPsychology
dc.subjectSoftware deployment
dc.subjectBIM
dc.subjectBusiness
dc.subjectFacilities Management
dc.subjectPost-occupancy evaluation (POE)
dc.subjectMarketing
dc.subjectComputer network
dc.subjectSoftware engineering
dc.subjectArchitectural engineering
dc.subjectBuilding information modeling
dc.subjectBuilding information modeling (BIM)
dc.subjectGeology
dc.subjectBuilding and Construction
dc.subjectFOS: Earth and related environmental sciences
dc.subjectOccupancy
dc.subjectD Geospatial Modelling Techniques
dc.subjectComputer science
dc.subjectProcess (computing)
dc.subjectFOS: Psychology
dc.subjectEarth and Planetary Sciences
dc.subjectOperating system
dc.subjectOccupant feedback
dc.subjectOperations management
dc.subjectPhysical Sciences
dc.subjectFacility management
dc.subjectProcess management
dc.subjectUse case analysis
dc.subjectScheduling (production processes)
dc.subjectPost-occupancy evaluation
dc.titleRateworkspace: BIM integrated post-occupancy evaluation system for office buildings
dc.typeArticle
dspace.entity.typePublication
person.identifier.orcid0000-0003-4614-3245
person.identifier.orcid0000-0001-6413-4647

Dosyalar

Koleksiyonlar