Yayın:
Probe Drilling Ahead of Two TBMs in Difficult Ground Conditions in Turkey

dc.contributor.authorBilgin, Nuh
dc.contributor.authorAtes, Ugur
dc.date.accessioned2026-01-25T09:22:24Z
dc.date.issued2016-03-02
dc.description.abstractThis paper summarizes the results of probe drilling carried out ahead of TBMs in two difficult tunneling projects in Turkey. The tunnels have completely different geological characteristics which necessitated two different methods of data analysis. Melen Water Tunnel was excavated under Istanbul Bosphorus within sedimentary rocks which are cut frequently by andesitic dykes, fracturing the surrounding rocks and creating a potential risk for water ingress into the tunnel. At the beginning of Melen Project, pioneering probe drillings with petrographic analysis and strength tests were performed on samples collected from TBM muck. This analysis allowed identifying some critical normalized probe drilling rate values for predicting potential weak zones created by andesitic dykes. These studies gave a sound basis for further interpretation of TBM and geologic data for the same tunnel. The second set of probe drilling analysis was from Kargi Tunnel. The North Anatolian Fault highly affected the tunnel excavation by fractured rock formations. Although the change in normalized probe drilling data was a good indicator of fractured zones, the diversity of rock formations made it difficult to interpret the data.
dc.description.urihttps://doi.org/10.1007/s00603-016-0937-9
dc.description.urihttps://dx.doi.org/10.1007/s00603-016-0937-9
dc.identifier.doi10.1007/s00603-016-0937-9
dc.identifier.eissn1434-453X
dc.identifier.endpage2772
dc.identifier.issn0723-2632
dc.identifier.openairedoi_dedup___::76f7434c37ee974a57d16a2fff4074ed
dc.identifier.orcid0000-0001-6562-7590
dc.identifier.orcid0000-0003-4490-5939
dc.identifier.startpage2763
dc.identifier.urihttps://hdl.handle.net/11527/48396
dc.identifier.volume49
dc.language.isoeng
dc.publisherSpringer Science and Business Media LLC
dc.relation.ispartofRock Mechanics and Rock Engineering
dc.rightsCLOSED
dc.sdg.typeGoal 6: Clean Water and Sanitation
dc.titleProbe Drilling Ahead of Two TBMs in Difficult Ground Conditions in Turkey
dc.typeArticle
dspace.entity.typePublication

Dosyalar

Koleksiyonlar