Yayın:
The integrated framework for analysis of electricity supply chain using an integrated SWOT-fuzzy TOPSIS methodology combined with AHP: The case of Turkey

dc.contributor.authorBas, Esra
dc.contributor.ituauthorBaş, Esra
dc.date.accessioned2026-01-26T06:44:04Z
dc.date.issued2013-01-01
dc.description.abstractAbstract This paper proposes an integrated framework for analysis of an electricity supply chain using an integrated SWOT-fuzzy TOPSIS methodology combined with Analytic Hierarchy Process (AHP). The paper is divided into two main sections. In the first main section, the integrated framework comprising a qualitative framework and a quantitative framework is presented. In the qualitative framework, a general structure and so-called advanced planning framework are developed for an electricity supply chain based on the literature review in supply chain management (SCM). Then, a quantitative Strengths–Weaknesses–Opportunities–Threats (SWOT) framework is used to formulate a strategy plan based on the elements from the proposed qualitative framework. Since a qualitative SWOT analysis can be insufficient to formulate an action plan, an integrated SWOT-fuzzy TOPSIS methodology combined with AHP is proposed to prioritize the defined SWOT factors and to formulate a strategy plan with top priorities. In the second main section, the integrated framework is illustrated with the case of electricity supply chain in Turkey.
dc.description.urihttps://doi.org/10.1016/j.ijepes.2012.08.045
dc.description.urihttps://dx.doi.org/10.1016/j.ijepes.2012.08.045
dc.identifier.doi10.1016/j.ijepes.2012.08.045
dc.identifier.endpage907
dc.identifier.issn0142-0615
dc.identifier.openairedoi_dedup___::f0becec78b9a34df315e92effbda5ed3
dc.identifier.orcid0000-0002-7101-3074
dc.identifier.startpage897
dc.identifier.urihttps://hdl.handle.net/11527/62972
dc.identifier.volume44
dc.language.isoeng
dc.publisherElsevier BV
dc.relation.ispartofInternational Journal of Electrical Power & Energy Systems
dc.rightsOPEN
dc.titleThe integrated framework for analysis of electricity supply chain using an integrated SWOT-fuzzy TOPSIS methodology combined with AHP: The case of Turkey
dc.typeArticle
dspace.entity.typePublication
person.identifier.orcid0000-0002-7101-3074

Dosyalar

Koleksiyonlar