<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css">

Publication:
Comparative evaluation of cost for preliminary and tertiary municipal wastewater treatment plants in Istanbul

dc.contributor.authorOzgun, H.
dc.contributor.authorCicekalan, B.
dc.contributor.authorAkdag, Y.
dc.contributor.authorKoyuncu, I.
dc.contributor.authorOzturk, I.
dc.contributor.departmentÇevre Mühendisliği Bölümü
dc.contributor.departmentÇevre Mühendisliği Bölümü
dc.contributor.departmentÇevre Mühendisliği Bölümü
dc.contributor.departmentÇevre Mühendisliği Bölümü
dc.contributor.ituauthorErşahin, Hale Özgün
dc.contributor.ituauthorÇiçekalan, Büşra
dc.contributor.ituauthorAkdağ, Yasemin
dc.contributor.ituauthorKoyuncu, İsmail
dc.date.accessioned2026-01-25T10:38:57Z
dc.date.issued2021-07-01
dc.description.abstractAs the global economy continues to grow, the need for an economic evaluation of wastewater treatment plants (WWTPs) is increasing. Determination of cost functions (CFs) helps to assess the costs of WWTP and to be able to reach to the satisfactory financial levels of construction and operation practices in the early phases of a project. In this study, unit capital and operation and maintenance (O&M) costs were calculated by analyzing the real capital and operation and maintenance expenditures of 16 full-scale WWTPs in Istanbul. Besides, the impacts of treatment level and capacity on costs were investigated. The unit total capital cost was found as 0.013 ± 0.004 €/m3 and 0.054 ± 0.009 €/m3 for preliminary and tertiary treatment, respectively, whereas the unit total O&M cost were 0.011 ± 0.007 €/m3 and 0.077 ± 0.021 €/m3 for preliminary and tertiary treatment, respectively. Capital (investment) costs covered 58% of the total cost in preliminary WWTPs, whereas; O&M costs had the highest share (58%) in tertiary WWTPs. The results of this study confirmed that the level of treatment considerably affected the costs of WWTPs. Moreover, the CFs were separately derived for tertiary treatment including A2O with and without digester. The CFs obtained in this study are of utmost importance to be used in the economic evaluation of the planned WWTPs and in the management of existing ones.
dc.description.urihttps://doi.org/10.1016/j.scitotenv.2021.146258
dc.description.urihttps://pubmed.ncbi.nlm.nih.gov/33714828
dc.description.urihttps://dx.doi.org/10.1016/j.scitotenv.2021.146258
dc.identifier.doi10.1016/j.scitotenv.2021.146258
dc.identifier.issn0048-9697
dc.identifier.openairedoi_dedup___::825998baa042992dceebc15b32bbbd92
dc.identifier.startpage146258
dc.identifier.urihttps://hdl.handle.net/11527/49838
dc.identifier.volume778
dc.language.isoeng
dc.publisherElsevier BV
dc.relation.ispartofScience of The Total Environment
dc.rightsCLOSED
dc.sdg.typeGoal 11: Sustainable Cities and Communities
dc.sdg.typeGoal 6: Clean Water and Sanitation
dc.sdg.typeGoal 12: Responsible Consumption and Production
dc.titleComparative evaluation of cost for preliminary and tertiary municipal wastewater treatment plants in Istanbul
dc.typeArticle
dspace.entity.typePublication
person.identifier.orcid0000-0001-8784-8351
person.identifier.orcid0000-0001-8354-1889

Files

Collections