Publication:
A Parallel Implementation of Unscheduled Flow Control in Interconnected Power Systems

Loading...
Thumbnail Image

Advisor

Journal Title

Journal ISSN

Volume Title

Publisher

Wiley

Research Projects

Organizational Units

Journal Issue

Abstract

The unscheduled power flow problem needs to be minimized or controlled as soon as possible in a deregulated power system since the transmission systems are mostly operated at their power‐carrying limits or very close to it. The time spent for simulations to determine the current states of all the system and control variables of the interconnected power system is important. Taking necessary action in case of any failure of equipment or any other occurrence of an undesired situation could be critical. Using supercomputing facilities and parallel computing techniques together decreases the computation time greatly. In this study, a parallel implementation of a multiobjective optimization approach based on both genetic algorithms and fuzzy decision making to manage unscheduled flows is presented. Parallel computation techniques are applied using supercomputers (high‐performance computers). The proposed method is applied to the IEEE 300 bus test system. Two different cases for some parameters of GA are considered to see the power of parallel computation technique. Then the simulation results are presented.

Description

Subject

Applications of mathematical programming, Deterministic network models in operations research, Multi-objective and goal programming

Citation

Collections

Endorsement

Review

Supplemented By

Referenced By

Related Goal

0

Views

0

Downloads
View PlumX Details