Solution to the Problem of Inaccurate Duration-Estimation: Relational Database Model for Design/Build Organizations

Loading...
Thumbnail Image

Institution Authors

Advisor

Department

Journal Title

Journal ISSN

Volume Title

Publisher

Informa UK Limited

Research Projects

Organizational Units

Journal Issue

Abstract

For various participants of projects, accuracy in the estimation of project duration is vital at various stages of the building production process. The importance of the problem has been acknowledged by the industry worldwide, and various models have been proposed in the literature, but all have their limitations. This paper presents a performance-based duration-estimation model that utilizes historical knowledge, in particular information to estimate the worst, best and likely variances of current projects by using the unified structure of an information system developed for design/build organizations. The model allows the estimators to make use of data on past projects. Proposed organizational pattern, design/build, are vital for accessing the as-built schedules and variance information provided by construction groups in a design/build organizational pattern. Our final solution includes an integrated relational database model developed for design/build organizations that provides the integration of sate...

Description

Journal or Series

Architectural Science Review

ISSN

0003-8628

ISBN

Rights

Keywords

Citation

Collections

Endorsement

Review

Supplemented By

Referenced By

Related Patent

Related Goal

2
Görüntülenme
0
İndirme
Altmetric
Dimensions
PlumX Metrikleri
BIP! Indicators
Google Scholar
Scholar'da Ara ↗