Publication: Assembly Line Balancing in Garment Production by Simulation
Loading...
Date
Authors
Advisor
Department
Journal Title
Journal ISSN
Volume Title
Publisher
InTech
Type
Abstract
Construction of a quality garment requires a great deal of know-how, a lot of coordination and schedule management. Clothing manufacturing consists of a variety of product categories, materials and styling. Dealing with constantly changing styles and consumer demands is so difficult. Furthermore, to adapt automation for the clothing system is also so hard because, beside the complex structure also it is labor intensive. Therefore, garment production needs properly rationalized manufacturing technology, management and planning (Glock et. al, 1995; Caputo, et. al., 2005). In garment production, until garment components are gathered into a finished garment, they are assembled through a sub-assembly process. The production process includes a set of workstations, at each of which a specific task is carried out in a restricted sequence, with hundreds of employees and thousands of bundles of sub-assemblies producing different styles simultaneously (Chan et al, 1998). The joining together of components, known as the sewing process which is the most labor intensive part of garment manufacturing, makes the structure complex as the some works has a priority before being assembled (Cooklin, 1991). Furthermore, since sewing process is labor intensive; apart from material costs, the cost structure of the sewing process is also important. Therefore, this process is of critical importance and needs to be planned more carefully (Tyler, 1991). As a consequence, good line balancing with small stocks in the sewing line has to be drawn up to increase the efficiency and quality of production (Cooklin, 1991; Tyler, 1991; Chuter, 1988). An assembly line is defined as a set of distinct tasks which is assigned to a set of workstations linked together by a transport mechanism under detailed assembling sequences specifying how the assembling process flows from one station to another (Tyler, 1991). In assembly line balancing, allocation of jobs to machines is based on the objective of minimizing the workflow among the operators, reducing the throughput time as well as the work in progress and thus increasing the productivity. Sharing a job of work between several people is called division of labor. Division of labor should be balanced equally by ensuring the time spent at each station approximately the same. Each individual step in the assembly of product has to be analyzed carefully, and allocated to stations in a balanced way over the available workstations. Each operator then carries out operations properly and the work flow is synchronized. In a detailed work flow, synchronized line includes short distances between stations, low volume of work in process, precise of planning of production times, and predictable production quantity (Eberle et al, 2004).
Description
Journal or Series
ISSN
ISBN
Rights
OPEN