Abstract Conventional primary cementing remains one of the most operationally critical yet failure-prone stages in well construction, particularly in high-pressure, high-temperature (HPHT) and slim-hole wells where narrow annular clearances, long waiting-on-cement (WOC) periods, shrinkage-induced micro-annulus formation, and slurry contamination continue to compromise zonal isolation. Although geopolymer materials have demonstrated promising mechanical and chemical advantages over Ordinary Portland Cement (OPC), existing applications still rely on slurry-based placement methods that inherit many of the same operational limitations. This paper presents an engineered methodology for an MgO-modified geopolymer casing jacket system designed to fundamentally rethink wellbore sealing by eliminating slurry displacement entirely. The proposed system consists of a pre-installed dry geopolymer annular jacket activated in situ using pressure-balanced alkaline cartridges deployed through an internally triggered activation sequence. The methodology integrates annular geometry design, cartridge-based activation, radial nozzle distribution, segmented activation logic, and controlled MgO expansion for shrinkage compensation. Engineering validation was performed through analytical modelling, pressure balancing, dimensional verification, sensitivity analysis, and failure mode assessment. Results indicate that the system is geometrically compatible with an 8.5 in × 7 in slim-hole configuration, requiring only 2.1 MPa differential pressure for activation at 3000 m depth. Controlled MgO expansion within 0.0–0.2% generates approximately 20 MPa radial stress, remaining significantly below casing yield limits with an estimated safety factor of 18.9. Operational analysis suggests that eliminating slurry displacement and reducing WOC requirements could reduce cementing duration by 40–80%. Although laboratory and field validation remain future work, the proposed methodology establishes a technically feasible framework for next-generation wellbore sealing in challenging drilling environments.
Description
Journal or Series
Spe europe energy conference and exhibition
ISSN
ISBN
Rights
closedAccess