<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css">

Publication:
Team based labour assignment methodology for new product development projects

Loading...
Thumbnail Image

Institution Authors

Advisor

Department

Journal Title

Journal ISSN

Volume Title

Publisher

Elsevier BV

Research Projects

Organizational Units

Journal Issue

Abstract

We develop a team based labour assignment methodology for NPD projects.Proposed hierarchical methodology integrates VSM, DSM and clustering techniques.The aim is to eliminate waste and create flow to reduce lead time.A real life application is performed to evaluate the proposed methodology.The results tested by simulation have promised significant lead time reduction. This study explores the organizational aspects of new product development projects and proposes a new team-based labour assignment methodology. The proposed hierarchical methodology focusses on the project value stream and aims to shorten lead time through waste reduction. Lean product development tools, such as clustering and design structure matrix tools, are integrated with the methodology. A detailed real-life case study is presented and the proposed methodology is evaluated using discrete event simulation. Experiment results show that the proposed methodology and team-based structure provide superior lead time performance when compared to conventional organizational setting. This study contributes to existing literature by presenting evidence of the effect of teams on NPD lead time performance.

Description

Journal or Series

Computers &amp; Industrial Engineering

ISSN

0360-8352

ISBN

Rights

CLOSED

Keywords

Citation

Collections

Endorsement

Review

Supplemented By

Referenced By

Related Patent

Related Goal

Google Scholar
Scholar'da Ara ↗
Altmetric
Dimensions
PlumX Metrikleri
BIP! Indicators