Publication: Ant colony optimization for multi-objective flow shop scheduling problem
Loading...
Date
Authors
Yagmahan, Betul
Yenisey, Mehmet Mutlu
Advisor
Department
Journal Title
Journal ISSN
Volume Title
Publisher
Elsevier BV
Type
Abstract
Flow shop scheduling problem consists of scheduling given jobs with same order at all machines. The job can be processed on at most one machine; meanwhile one machine can process at most one job. The most common objective for this problem is makespan. However, multi-objective approach for scheduling to reduce the total scheduling cost is important. Hence, in this study, we consider the flow shop scheduling problem with multi-objectives of makespan, total flow time and total machine idle time. Ant colony optimization (ACO) algorithm is proposed to solve this problem which is known as NP-hard type. The proposed algorithm is compared with solution performance obtained by the existing multi-objective heuristics. As a result, computational results show that proposed algorithm is more effective and better than other methods compared.
Description
Journal or Series
Computers & Industrial Engineering
ISSN
0360-8352
ISBN
Rights
CLOSED